A shrimp pond aerator controller that adjusts aeration to oxygen demand before dawn.

SOLACE model showing the solar panel, controller enclosure, water sensors and paddlewheel aerator.
System design from team IMBNED’s proposal.

Explore the pitching demo

Explore the pond controller or inspect the hardware assembly in the IMBNED team’s interactive viewer.

My role
IMBNED captain and team representative
Collaboration
Four-person team
Achievement
Top 10 in the Energy Track

When should the aerator run?

A timer runs the aerator on a fixed schedule. We designed dissolved-oxygen controls to respond to estimated pre-dawn demand. A solar panel and battery are part of the power design.

I led team IMBNED, coordinated hardware, control logic and proposal work, and represented the team at the Delta Cup regional final in Bangkok.

SOLACE architecture. Water sensors send readings to the ESP32 that controls the aerator motor.
Power delivery, sensor readings and aerator control.
Top side of the SOLACE RevS-2 circuit board design.
RevS-2 PCB layout, top side.

SOLACE versus a timer

The September 19, 2026 tests used a physical motor and simulated pond conditions. Each run represented 12 hours of virtual night. Wh values project motor power over simulated time.

Medium load

32.8%

lower than the selected timer

Projected motor energy

SOLACE2.14 Wh
Timer3.19 Wh

Minimum modeled dissolved oxygen: 3.65 mg/L with SOLACE and 3.21 mg/L with the timer. Test threshold: 3.0 mg/L.

High load

45.4%

lower than the selected timer

Projected motor energy

SOLACE3.53 Wh
Timer6.47 Wh

Minimum modeled dissolved oxygen: 3.63 mg/L with SOLACE and 3.18 mg/L with the timer. Test threshold: 3.0 mg/L.

Light load

Timer switched off

With initial oxygen at 6.2 mg/L, the pond model stayed above 3.0 mg/L overnight without scheduled aeration. This scenario has no comparable savings percentage.

How was the timer selected?

We screened 20 timer settings per scenario, including off. For physical motor trials, we selected the lowest-energy schedule that met the oxygen threshold in the model. The selected timer ran at 22:00 for one hour under medium load and two hours under high load.

What was measured and simulated?

Power was measured with a motor current sensor. Oxygen came from the model. The chart projects energy over virtual time. Full-system electricity use and performance in a real pond still require testing.

Sample data · 12 hours

One night at the pond

Scrub through the night to compare motor power and dissolved oxygen. Both curves are illustrative and separate from the SOLACE test results above.

Contributions & results

60.6%Energy savings in the illustrative 48-hour simulation
Top 10Energy Track · Delta Cup 2026
2 layersPCB KiCad RevS-2
Jun–Nov 2026

Team captain & system architect

I led IMBNED, designed the PCB, and developed the firmware and control logic. I also prepared the proposal and presented the partial prototype in Bangkok.

Design

Aeration that follows pond conditions

The architecture combines an ESP32-S3, dissolved oxygen measurements and aeration scheduling based on solar availability. In an illustrative 48-hour scenario, the model kept oxygen above 3.0 mg/L.

Sep 2026 · Testing

What we tested on the bench

VirtualPond recorded physical pump and current measurements against virtual pond, battery and solar conditions. Six accelerated hardware-in-the-loop tests took about 145–220 seconds each. Two other comparison scenarios missed the 60% savings target against the best timer. Field validation remains open.